الميزات الأساسية- 12000 BTU cooling capacity with T1 climatic condition
- Energy-efficient R32 refrigerant with auto restart feature
- Goldfin technology for enhanced durability and performance
- Quiet operation with 30~42 dB(A) indoor noise level
- High airflow circulation (≥650m³/h) with 3M pipe kit
نظرة عامةThe NSAC12VT1 split air conditioner delivers efficient cooling with a 12000 BTU capacity, ideal for maintaining comfort in warm climates. Designed for durability, it features an energy-efficient R32 refrigerant, a highly efficient compressor, and Goldfin technology for extended lifespan. Its auto restart function ensures uninterrupted operation, while the mechanical control system provides easy adjustments. The unit operates quietly, with an indoor noise level of just 3042 dB(A), ensuring a peaceful environment. With a 3M pipe kit, high airflow circulation of ≥650m³/h, and a sleek, unique operating panel, this air conditioner is a reliable cooling solution for homes and offices. It runs on 220-240V, 50Hz power, making it both powerful and energy-efficient. Terms & Conditions for AC Installation – UAE Covered under Standard Installation: • Drilling of holes into a brick wall for routing pipes. • Fixing of hole sleeve and cap. • Installation and connection of indoor and outdoor units using the standard installation kit provided with the product. Not Covered under Standard Installation (Additional charges apply): • Provision or installation of outdoor unit stand. • Extra copper piping or wiring beyond the standard kit. • Extension of drain pipes. • Electrical wiring extension from the meter to the installation location. • Vinyl tape or other additional consumables. • Dismantling or relocation of existing air conditioning units. • Sealing of holes with white cement or similar materials. • Provision or installation of voltage stabilizer. • Plumbing or masonry work. • Power socket/MCB installation or other electrical services. • Carpentry work. • Core cutting, fabrication, or any electrical customization. • Installation work beyond a height of 3 meters. • Removal and disposal of existing unit and packaging materials. • Any change in installation location after service initiation. Customer Preparations Prior to Installation: • Obtain permission for drilling and product movement within the premises. • Ensure no water pipes obstruct the wall where drilling is required. • Confirm availability of service lift or wide staircase for moving the unit. • Ensure existing installations are removed if a new unit is to be installed at the same location.