Highlights- Hisense 1.5 Ton Window Air Conditioner 18000 BTU Rotary Compressor R410A T3 Color White Model AW18CT4SPAR01 – (international Version).Rotary Compressor, Auto Restart, Self-Evaporative System and more! Beat the heat and enjoy cool and fresh air all da
- The model AW18CT4SPAR01 features Auto-Restart, Twist-control knobs, Self-Evaporative System and rotary compressor. Powerful and efficient 1.5 ton 18000 BTU cooling power. Our window air-conditioners come with practical Twist-control knobs for easy op
- Features a thermostat knob and selector knob for various fan modes and cooling modes as per preference. Auto-swing button ensures cool air is delivered uniformly across the room. Having the air circulating more efficiently, the room is also cooled do
- It ensures air is circulated all-round and rooms are cooled down evenly. Thanks to their compact, sleek design, our window cooling-units are perfect for dining rooms, bedrooms, shops, restaurants and cafes to give guests a fresh breeze or in the gym
OverviewTerms & Conditions for AC Installation – UAE Covered under Standard Installation: • Drilling of holes into a brick wall for routing pipes. • Fixing of hole sleeve and cap. • Installation and connection of indoor and outdoor units using the standard installation kit provided with the product. Not Covered under Standard Installation (Additional charges apply): • Provision or installation of outdoor unit stand. • Extra copper piping or wiring beyond the standard kit. • Extension of drain pipes. • Electrical wiring extension from the meter to the installation location. • Vinyl tape or other additional consumables. • Dismantling or relocation of existing air conditioning units. • Sealing of holes with white cement or similar materials. • Provision or installation of voltage stabilizer. • Plumbing or masonry work. • Power socket/MCB installation or other electrical services. • Carpentry work. • Core cutting, fabrication, or any electrical customization. • Installation work beyond a height of 3 meters. • Removal and disposal of existing unit and packaging materials. • Any change in installation location after service initiation. Customer Preparations Prior to Installation: • Obtain permission for drilling and product movement within the premises. • Ensure no water pipes obstruct the wall where drilling is required. • Confirm availability of service lift or wide staircase for moving the unit. • Ensure existing installations are removed if a new unit is to be installed at the same location.