• usp_easy_retunsFree & Easy Returns
  • usp_best_dealsBest Deals

Slip Lead Dog Leash, 1.5mx1cm Rope Training Leash, Long Lead Leash for Dog Training for Pet Walking for Puppies and Large Dogs, Small, Medium, No-Pull Behavior Training Loop

27.60
30.00 
Inclusive of VAT
Saving:
2.40 
7% Off
nudge icon
Free Delivery
nudge icon
Only 2 left in stock
nudge icon
Free Delivery
noon-express
Get it by 5 June
Order in 20 h 48 m
VIP ENBD Credit Card

Delivery 
by noon
Delivery by noon
Cash on 
Delivery
Cash on Delivery
Secure
Transaction
Secure Transaction
placeholder
https://affiliates.noon.com/en
Product Overview
Overview

【BUILT TO LAST】Our dog leash si made of ultra-strong 1/2 inch diameter nylon climbing rope. is the best choice for training leashes for small medium dogs or large dogs. this dog leash keeps your dog secure for a walk around the neighborhood or a fast-paced run through the wilderness.woven rope material provides a comfortable grasp for sustained control, allowing you to enjoy each adventure with your dog.

【COMFORTABLE TO HOLD】Features soft padded handles for amazing comfortable shock grip.the comfortable foam handle helps you maintain firm and comfortable grip without digging into your hands even when your dog pulls hardly. just enjoy the feeling walks with your dog and protects your hand from rope burn.

【LEASH & COLLAR COMBINATION】This slip leash acts as a leash and a collar in one. simply slip the loop over your dogs neck and use the handle end as a leash. leash and collar in one combination that is great for walking, running and trainning. give enough freedom to your dog and everything absolutely under your control.

【6 FT REFLECTIVE DOG LEASH】Our dog leash is a perfect choice to bring balance between freedom and control for your pet during daily walks. dog leash suitable for outdoor sports such as hiking, camping, training, hunting, backyard, beach, mountaineering, walking, running, etc.

【 REFLECTIVE STRANDS】Our strong dog leash used the unique machine knitting technology which make us the most popular in the market. our great large dog leashes is made of ultra-durable and wear-resistant nylon rope, and stitched with reflective line along the length of the dog leash thick rope, highly visibility at night, keeps you both safe and high visibility on your late-evening walks at night.

Cart Total  27.60

We're Always Here To Help

Reach out to us through any of these support channels

Shop On The Go

App StoreGoogle PlayHuawei App Gallery

Connect With Us

mastercardvisatabbytamaraamexcod