• usp_easy_retunsاسترجاع مجاني وسهل
  • usp_best_dealsأفضل العروض

عداد كهربائي سلكي بمرحلة واحدة 1 مرحلة 2

191.50
(شاملة ضريبة القيمة المضافة ورسوم الاستيراد)

أكواد

التوصيل 
بواسطة نوون
التوصيل بواسطة نوون
منتج 
قليل الاسترجاع
منتج قليل الاسترجاع
عملية 
تحويل آمنة
عملية تحويل آمنة
placeholder
/alinma-bank
نظرة عامة على المنتج
نظرة عامة
TypeElectric panel


MAKEL Single Phase 1 Phase 2 Wire Electricity Meter

Electricity Meter Safety Warnings 

  • The installation and commissioning of the product must be carried out by authorized electricity distribution company personnel.
  • The electricity must be cut off while installing and dismantling the electricity meter.
  • The electrical parts of the meter should never be touched.
Rules to be followed when using the electricity meter
  • The installation location of the meter must be free from external influences such as dust, water and moisture.
  • The sealed main cover should never be opened. The terminal cover should never be opened except by officials of the electricity distribution company. If these are opened, the meter records the opening date and the necessary penal sanctions are applied by the electricity distribution company.

Reading Electricity Meter Information

While the meter is connected to the electricity network, the main information held by the meter is automatically displayed on the LCD screen every 5 seconds. You can also quickly move to the next information in the menu by pressing the blue button on the meter. Additionally, when the blue button is pressed for 5 seconds while there is electricity, the screen switches to the extended menu. In this case, each time you press the blue button, the next information in the expanded menu is displayed.
30 seconds after pressing the button, the screen returns to automatic switching mode. To see the information held by the meter on the screen when there is no electricity, press the blue button, and with each press, the next information appears on the screen.
The information held by the meter can also be read via the optical port on it. For this purpose, data transfer is made by connecting the optical port reader hardware to the optical port on the meter. When there is no electricity, readings can be made by pressing the blue button once. If the reading process does not start within 10 seconds, the button must be pressed again.
In meters with RS485 communication option, information can also be read via this port. This process can be done while there is electricity.

المواصفات
رمز النظام المنسق910212000000
مجموع السلة  191.50

نحن دائماً جاهزون لمساعدتك

تواصل معنا من خلال أي من قنوات الدعم التالية:

تسوق أينما كنت

App StoreGoogle PlayHuawei App Gallery

تواصل معنا

madamastercardvisatabbytamaraamexcod
شركة حلول نون للتسويق الالكتروني شركة شخص واحد ش.ذ.م.م1010703009 السجل التجاري302004655210003 الرقم الضريبي